On July 4, 2010, the 3-person team led by SCG project operation director, Mr. Surapon visited Sinoma EC. Sinoma EC’s Chairman of Board of Directors, Mr. Zhang Qi, General Manager, Mr. He Xinping, Vice President, Mr. Ge Liwu, Chief Engineer, Mr. Dong Lanqi respectively met with them.

 

">

午夜福利不卡片在线机免费视频-久草91-a成人在线-亚洲福利在线观看-欧美我不卡-在线综合视频-国产传媒第一页-精品一区二区三区在线成人-国产精品每日更新-亚洲人成无码网站18禁10-亚洲欧洲久久久-特级西西人体444www高清大胆-亚洲精品成a人在线观看-性高朝久久久久久久-青青草偷拍视频

Position: 首頁 < Home < News < Company News

Technical Communications between Sinoma EC and SCG

PublishDate:2010-07-13 Source:

On July 4, 2010, the 3-person team led by SCG project operation director, Mr. Surapon visited Sinoma EC. Sinoma EC’s Chairman of Board of Directors, Mr. Zhang Qi, General Manager, Mr. He Xinping, Vice President, Mr. Ge Liwu, Chief Engineer, Mr. Dong Lanqi respectively met with them.

In the two-day meeting, technical details were talked, including WHR power plant operation, maintenance, spare parts supply and plant overhauling. Leaders and employees from marketing, project execution, technical and R&D, procurement, after sale divisions attended these discussions.

Sinoma EC built 6 WHR power plant for 3 cement plants of SCG, with total installed capacity of 58MW. The WHR plants for SCG TS plant first phase (9MW), second phase WHR (22MW), TL plant (18MW), LP plant(9 MW) were built by Sinoma EC, and all of them are now in good operation.